
Cantilever Overview
Compare rear and centre support layouts before settling on a frame.
View DesignA T-cantilever frame uses a central steel post and a crossarm that projects to both sides. A line of these frames can carry a fabric canopy over back-to-back parking bays while leaving the outer aisles clear of columns. It suits staff, visitor and fleet parking where there is room for a shared support line between the rows.
Request a Quotation
Start with the tallest vehicle that will use each row, including service vehicles. Check the usable height below the lowest beam or connection and show where existing lights, signs or other overhead fixtures sit. If the rows differ in depth or pavement level, show both sides on the plan.
Mark the space available for posts and footings along the centre strip. Include kerbs, wheel stops, drains and known buried services. Check that the proposed post line leaves room for drivers to turn and open doors.
The published size options are 12 × 21 ft, 14 × 21 ft and 14 × 27 ft. Sizes can be adjusted on request. Confirm final coverage, canopy projection, post positions and vehicle clearances for both rows on the approved drawings before fabrication.
The published design uses a T-shaped steel frame with an HDPE fabric canopy. Open-weave HDPE provides shade and allows air and rain to pass through. Confirm the mesh grade and steel finish for the site in the written quotation.
Published colours include white, cream, green, dark green, dark grey, grey, orange, yellow, black, red, blue and dark blue. Confirm colour availability and any warranty terms in the written quotation.

Compare rear and centre support layouts before settling on a frame.
View Design
For a single row where the posts can sit behind the bays.
View Design
Compare shared centre supports for two back-to-back rows.
View DesignSend the project city, a plan or photos of both rows, the proposed post line and the tallest vehicle on each side. Include any change in pavement level and mark nearby lights, signs and drains so the crossarm clearance and footing positions can be checked.
Request a Quotation